
- Client: Kenmont Primary School In North London.
- Brief: Existing carpet had to be lifted and removed from site and a new sub floor prepared ready for a new floor covering to be installed within a limited period prior to the new term.
- The solution: A high performance latex screed was installed on the surface of the concrete sub floor. Then a new carpet was installed well within the time allowed.
See more Carpet projects completed by The Flooring Group.

