contracts portfolio

Over 160 Metres Of Linoleum Laid In A North London Medical Practice: covering suitability, preparation, and installation details, for UK homes and businesses.

Key points

  • Client: Over 160 Metres Of Linoleum Laid In A North London Medical Practice.
  • The brief: To remove stuck down carpet throughout the waiting & reception areas, corridors and consulting rooms and replace with an ecological and bacteria resistant product.
  • The solution: Existing stuck down carpets were stripped up, new ply installed and a feather screed applied to cover the joints and screw holes. Sheet lino was then stuck down throughout, the joints welded and the perimeter sealed with clear silicone sealant.

For the latest information about The Flooring Group and our residential and commercial flooring, please visit our homepage.

Share the Post:

Related Posts

Scroll to Top