Key points
- Client: Headmistress Office And Meeting Room In North London.
- Brief: To replace existing carpet with 40 metres of Prime Oak woodblock with a 2-line Wenge border around perimeter.
- The solution: A plywood sub-floor was laid in preparation and for the installation of the blocks. These were then filled and sanded & sealed with Bonakemi Laquer.
For the latest information about The Flooring Group and our residential and commercial flooring, please visit our homepage.